The Gold Mine is the primary source of Gold Nuggets for your Alliance. By upgrading the Gold mine, Power station, Minecarts and Sluice box over time as a team, you can ensure a steady flow of income to support your team's development.
What Is Required to Start Gold Production
By default, a Level 1 Gold Mine becomes available as soon as an Alliance is created. However, it will not operate without power. To keep the Gold Mine running, you must build a Power Station.
To collect Gold Nuggets, you must also construct a Safe, as Nuggets cannot accumulate without it.
Therefore, the Power Station and the Safe are the first essential buildings required for a newly created Alliance to begin gold production.
Gold Mine – Main Building
|
Gold Mine |
Gold production: 15 / 25 / 40 / 60 / 80 per day Energy consumption: 1 / 10 / 50 / 180 / 400 kW |
Gold Mine Projects
| Minecarts |
Built to transport precious gold. Upgrading the carts boosts gold production. Gold production: 5 / 10 / 15 / 20 / 25 per day |
| Sluice box |
This is where gold nuggets are being separated from ore and delivered to the Headquarters. In order to scale up refining, you need to upgrade the Sluice Box. Increases gold mining by 5 / 10 / 15 / 20 / 25 per day |
Please note: The bonus in the Sluice Box must be activated manually using Reputation Points earned from Alliance Assignments. You can find more details about bonus activation in this article.
Additional Income: Railway Station
| Upgrading the Railway Station will also allow you to increase your gold nugget income: Gold production: + 2 / 4 / 6 / 8 / 10 % per day |